|
|
Fiber Optic Cable Assemblies TAA Compliant 40GBase-CU QSFP+ Direct Attach Cable (Passive Twinax, 2m)
- EX-QSFP-40GE-DAC-2M-C
- Amphenol ProLabs
-
1:
₡55 299,45
-
Non-Stocked
-
New At Mouser
|
Mouser Part #
46-EXQFP40GEDAC2MC
New At Mouser
|
Amphenol ProLabs
|
Fiber Optic Cable Assemblies TAA Compliant 40GBase-CU QSFP+ Direct Attach Cable (Passive Twinax, 2m)
|
|
Non-Stocked
|
|
|
₡55 299,45
|
|
|
₡55 294,24
|
|
|
₡54 013,90
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
RF Cable Assemblies BNC (M), RG174/U MTO BULK
Fluke EM2249-K-600#
- EM2249-K-600#
- Fluke
-
Restricted Availability
|
Mouser Part #
676-EM2249-K-600#
|
Fluke
|
RF Cable Assemblies BNC (M), RG174/U MTO BULK
|
|
|
|
|
|
|
|
|
Spiral Wraps, Sleeves, Tubing & Conduit 9/32" 36AWG CONDUIT PRICE PER FT
TE Connectivity / Raychem HC1B-7008-0281-0
- HC1B-7008-0281-0
- TE Connectivity / Raychem
-
500:
₡19 673,59
-
Non-Stocked Lead-Time 45 Weeks
|
Mouser Part #
650-HC1B-7008-0281-0
|
TE Connectivity / Raychem
|
Spiral Wraps, Sleeves, Tubing & Conduit 9/32" 36AWG CONDUIT PRICE PER FT
|
|
Non-Stocked Lead-Time 45 Weeks
|
|
Min.: 500
Mult.: 500
|
|
|
|
|
Cable Tie Mounts T30REC20 BLKHS TIE& HIRHS CLIP
- 156-00799
- HellermannTyton
-
6 000:
₡624,56
-
Non-Stocked Lead-Time 10 Weeks
|
Mouser Part #
329-15600799
|
HellermannTyton
|
Cable Tie Mounts T30REC20 BLKHS TIE& HIRHS CLIP
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 6 000
Mult.: 500
|
|
|
|
|
Cable Mounting & Accessories HM4 H MOUNT 3/8 BLK
- 151-00973
- HellermannTyton
-
900:
₡962,86
-
Non-Stocked Lead-Time 6 Weeks
|
Mouser Part #
329-15100973
|
HellermannTyton
|
Cable Mounting & Accessories HM4 H MOUNT 3/8 BLK
|
|
Non-Stocked Lead-Time 6 Weeks
|
|
|
₡962,86
|
|
|
₡947,25
|
|
Min.: 900
Mult.: 900
|
|
|
|
|
Cable Ties Cable Tie, 12" Long, UL Rated, 80lb Tensile Strength, PA66, Black, 1000/pkg
- 111-08280
- HellermannTyton
-
1 000:
₡235,77
-
Non-Stocked Lead-Time 27 Weeks
|
Mouser Part #
329-111-08280
|
HellermannTyton
|
Cable Ties Cable Tie, 12" Long, UL Rated, 80lb Tensile Strength, PA66, Black, 1000/pkg
|
|
Non-Stocked Lead-Time 27 Weeks
|
|
Min.: 1 000
Mult.: 1 000
|
|
|